CLL has considerable experience in undertaking slip stabilisation projects.
We have specialised equipment and expertise to undertake projects with difficult access and requiring innovative construction techniques, and we work closely with engineering consultants to solve problems. In particular, we have worked closely with Tonkin and Taylor on many slip stabilisation projects.
We also regularly undertake slip stabilisation projects for the Earthquake Commission (EQC).
|
|
Otumoetai, Tauranga: Retaining Walls Spanning Several Properties |
.jpg) |
|
Milton Terrace, Napier: Palisade Wall with Capping Beam and Erosion Control |
.jpg) |
|
In-ground RC Piles, Tied-back Capping Beam, and I-beam Wall |
.jpg) |
|
Kawau Island: Retaining Walls and Erosion Control |
 |
|
33 Marau Cres, Mission Bay: Limited Access Drill - for Sites Without Machine Access |
 |
|
Ohope Beach: Palisade Walls |
 |
|